SOUTHERN VIRGINIA MEGASITE at Berry Hill

Experience an extraordinary advanced manufacturing workforce complimented by a pipeline of prepared students. Benefit from significant infrastructure investments that guarantee your success in Virginia’s largest certified Megasite with rail, natural gas, terabyte speed broadband, electric, water, sewer, permitting and zoning in place.

Over $100M of investment in infrastructure development ensures that industry risks are minimized at one of the largest Megasites on the East Coast. This central Mid Atlantic location is accessible to 2/3rds of the US industrial base within a one-day drive with direct access to international trade from Virginia’s port, the deepest on the East Coast.

Southern Virginia Mega Site sitemap

Fast Facts

3,528-acre publicly owned Megasite

Unique collaboration amongst multiple jurisdictions in 2 states

Suitable for OEM manufacturing operations and other large advanced industrial tenants

Ready for single or multiple industrial users

Largest possible contiguous parcel is 2,102 acres

Ultimate water capacity will be over 6 MGD, fed by 2 independent sources

3 MGD sanitary sewer system

Direct access to Williams Transco Pipeline via existing gate station onsite

Find out more.

Southern Virginia Mega Site map location on Mid-Atlantic East Coast of the US

StrategicEast Coast Location

Within 1 day’s drive of 60% of the US population and 2/3 of the US industrial base

Direct route to Mid-Atlantic Gateway at Port of Virginia

Find out more

Scalable Workforce Pipeline
$43 million invested in this pipeline with 200 graduates yearly
Community Commitment
Over $100 million invested, focusing on advanced manufacturing excellence
Accessible
Within a day’s drive of 60% of the US population & 2/3 of the US industrial base
Affordable
Stable taxes and manufacturing costs 18% below the national average